A Standard Construction Timeline
Enjoy this simple guide to the sequence of a standard residential construction project in Massachusetts.
At FiveTen Construction & Design, we understand that a clear timeline is key to a successful home remodeling project. From initial planning to the final touches, we prioritize communication and efficiency to ensure your project stays on track. Whether you're remodeling your basement or tackling a full home renovation, our streamlined process ensures minimal disruption and maximum results. Explore our construction timeline to see how we turn your vision into reality—on time and on budget.
-
On-Site Consultation Step OneInitial assessment and discussion of project requirements at the client's location.
-
Estimate Step TwoProvision of a proposed layout, scope of work and cost projection.
-
Signing of the Contract Step ThreeThe formal agreement and contractual commitment between the client and FiveTen Construction & Design.
-
Payment #1 Step FourFirst payment installment, typically a deposit, required to initiate the project.
-
Permit Application Step FiveSubmission of necessary documentation to obtain the required permits for construction.
-
Demo Step SixRemoval or demolition of existing structures or components, if required.
-
Framing Carpentry Step SevenConstruction of the structural framework for the project.
-
Rough Trades Step EightInstallation of required rough electrical, plumbing, and HVAC systems.
-
Fire Stopping Step NineImplementation of fire prevention measures as per building codes.
-
Rough Inspections Step TenPreliminary inspections of the electrical, plumbing, sheet metal and framing completed to assess the work done during the rough construction phase.
-
Payment #2 Step ElevenSecond payment installment due upon successful completion of the applicable rough inspections.
-
Insulation Step TwelveInstallation of insulation materials to regulate temperature and energy efficiency.
-
Insulation Inspection Step ThirteenExamination to ensure proper insulation installation and compliance with codes.
-
Plaster Step FourteenApplication of plaster or wall and ceiling finishing materials.
-
Flooring Step FifteenInstallation of flooring materials such as tiles, wood, or LVP.
-
Finish Carpentry Step SixteenDetail-oriented carpentry work to enhance the project's aesthetics, such as baseboard molding, stairwell enhancements and installation of interior doors.
-
Tradesmen Finish Step SeventeenInstallation of electrical, plumbing and HVAC finishes, such as light fixtures, switches, faucets, shower trims, and vent covers.
-
Prep and Paint Step NineteenSurface preparation and painting of all trim work, doors, walls, ceilings and stairwells.
-
Final Inspections Step TwentyComprehensive inspections to validate all electrical and plumbing systems and final building components .
-
Payment #3 Step Twenty OneFinal payment installment upon the successful completion of the electrical, plumbing and building inspections.
-
Creation of the Punch List Step Twenty TwoA complete compilation of outstanding tasks and issues for resolution by both the client and FiveTen Construction & Design.
-
Punch List Completion Step Twenty ThreeAddressing and completing the items on the Punch List to ensure project readiness.
-
Final Payment Step Twenty FourThe last payment installment is withheld until all Punch List items are resolved and the project is fully finished. The final payment is due upon the completion of the agreed upon Punch List and satisfaction of the client.