A Standard Renovation Sequence and Timeline - What to Expect.

In a significant remodeling project, multiple construction stages are typically involved. For such projects, a specific order is followed to ensure everything progresses smoothly. This holds true for residential remodeling ventures as well. Each phase in the remodeling process depends on the successful completion of the preceding one. Consequently, meticulous coordination among various trades and craftsmen is essential.

The following list outlines the 24 critical stages of a remodeling project, commencing with an on-site consultation and concluding with a final payment following the completion of the project punch list.

  • On-Site Consultation Step One
    Initial assessment and discussion of project requirements at the client's location.
  • Estimate Step Two
    Provision of a proposed layout, scope of work and cost projection.
  • Signing of the Contract Step Three
    The formal agreement and contractual commitment between the client and FiveTen Construction & Design.
  • Payment #1 Step Four
    First payment installment, typically a deposit, required to initiate the project.
  • Permit Application Step Five
    Submission of necessary documentation to obtain the required permits for construction.
  • Demo Step Six
    Removal or demolition of existing structures or components, if required.
  • Framing Carpentry Step Seven
    Construction of the structural framework for the project.
  • Rough Trades Step Eight
    Installation of required rough electrical, plumbing, and HVAC systems.
  • Fire Stopping Step Nine
    Implementation of fire prevention measures as per building codes.
  • Rough Inspections Step Ten
    Preliminary inspections of the electrical, plumbing, sheet metal and framing completed to assess the work done during the rough construction phase.
  • Payment #2 Step Eleven
    Second payment installment due upon successful completion of the applicable rough inspections.
  • Insulation Step Twelve
    Installation of insulation materials to regulate temperature and energy efficiency.
  • Insulation Inspection Step Thirteen
    Examination to ensure proper insulation installation and compliance with codes.
  • Plaster Step Fourteen
    Application of plaster or wall and ceiling finishing materials.
  • Flooring Step Fifteen
    Installation of flooring materials such as tiles, wood, or LVP.
  • Finish Carpentry Step Sixteen
    Detail-oriented carpentry work to enhance the project's aesthetics, such as baseboard molding, stairwell enhancements and installation of interior doors.
  • Tradesmen Finish Step Seventeen
    Installation of electrical, plumbing and HVAC finishes, such as light fixtures, switches, faucets, shower trims, and vent covers.
  • Prep and Paint Step Nineteen
    Surface preparation and painting of all trim work, doors, walls, ceilings and stairwells.
  • Final Inspections Step Twenty
    Comprehensive inspections to validate all electrical and plumbing systems and final building components .
  • Payment #3 Step Twenty One
    Final payment installment upon the successful completion of the electrical, plumbing and building inspections.
  • Creation of the Punch List Step Twenty Two
    A complete compilation of outstanding tasks and issues for resolution by both the client and FiveTen Construction & Design.
  • Punch List Completion Step Twenty Three
    Addressing and completing the items on the Punch List to ensure project readiness.
  • Final Payment Step Twenty Four
    The last payment installment is withheld until all Punch List items are resolved and the project is fully finished. The final payment is due upon the completion of the agreed upon Punch List and satisfaction of the client.
 

The Main Reasons Your Construction Timeline Can Change

Project Scope: The Extent of Your Remodel

The scope of work directly influences the project timeline. More extensive projects, with complex requirements, materials, and labor, naturally take longer to complete. Conversely, simpler projects tend to have shorter timelines.

Change Orders: Adjustments During the Project

Introducing changes or modifications mid-project can extend the timeline. For instance, ordering additional materials not readily available can cause delays.

Material Damages: Unforeseen Setbacks

Occasionally, materials are damaged during delivery or discovered damaged during the demolition phase. Replacing damaged items can add extra time to the project. In such cases, we will pause work and discuss available options with you.

Inspections: Regulatory Approvals

City and county inspections play a crucial role in project timelines. Although they usually occur promptly, an influx of projects for inspection in the area can delay the process.

Specialty Requirements: Unique Project Features

Custom or special project elements may necessitate the involvement of additional trades, potentially lengthening the project timeline.

Weather Conditions: Exterior Projects

For exterior projects, adverse weather conditions, such as rain, can temporarily halt progress. We will need to wait for favorable weather conditions before continuing the work.

Mistakes and Corrections: Swift Resolutions

While rare, mistakes can occur during a project. Rest assured that we will work diligently to rectify any issues and get the project back on track as quickly as possible."